![]() We warmly welcome customers around the world to cooperate and create a bright future. ![]() All these are in good quality and we have won the TUV Rheinland, IATF16949, ISO9001, ISO14001 and GB/T45001 certification. There are more than 3000 series of automotive products such as switch, connector, speed sensor, relay, fuse, fuse box, BCM control system, etc. In recent years, we have introduced a series of advanced equipment including dust-free workshop, automatic SMT, etc. ![]() Located in Yueqing, Zhejiang, our headquarters covers an area of more than 50,000 square meters, and has more than 600 employees. Now it has branches such as Conshion Technology, Ruichang Electronics, Unified Electric, Ruiqu Engineering, etc. is a supplier of research, development, production, sale and service. Every major clean agent system manufacturer worldwide relies on Retrotec’s expertise for both hold time and peak pressure predictions.1.More than 24 years professional production experienceĢ.Factory covers an area of 50000 square metersģ.36+ million pcs annual production capacity of auto switchĤ.Professional R&D team, more than 200 technicianĥ.ISO9001, IATF16949, CE certified Founded in 1997, Zhejiang Conshion Auto Electronic Co., Ltd. Retrotec has been the lead researcher for enclosure testing ever since. The Air Products team brought the gasification. Each gasifier converts 3,000 TPD of coal into synthesis gas that is further purified and converted into clean transportation fuels by Luan. before the Supreme Court: Preserving the Integrity of the System, The, 52 J. The gasifiers, which are four of the largest and most efficient in the world, employ Air Products gasification technology for converting coal to chemicals. They promoted it within NFPA and in 1986 wrote the first Enclosure Integrity standard. It has been accepted for inclusion in Journal of Air Law and. Request literature on all of Retrotec systems to determine the size of enclosures that can be tested with each system.Testing pressure relief vents will require more power.Īll Retrotec systems include tech support from Retrotec who originated the idea of Enclosure Integrity testing in 1984. This system will test the venting for a volume up to a maximum of 9,000 cu ft (250 m3) for Inert agents although vents up to 6 sq ft (0.6 m2) can be measured individually. Test for hold times in flooded volumes up to 35,000 cu ft (1000 m3) for Inert agents and 70,000 cu ft (2000 m3) for halocarbon chemical agents. Everything You Need For Entry Level Enclosure Integrity Testing ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |